Commercial
A typical exterior uplift, the HiQ depot in Erdington, showing the facade before and after.


The surfaces were sprayed with a HVLP (high volume low pressure) spray and was finished in 3 days, whilst the business was operating normally!


The San Giovanni restaurant (above - before, below - after) at Sheepy Parva was decorated internally and externally to a very tight schedule of just 5 days.


Another play area at a commercial premises
- before and after.


Renovation of the Red Lion Inn, Pinwall - restaurant above, emblem outside.